Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the google-analytics-for-wordpress domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/skylined/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the htmega-addons domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/skylined/public_html/wp-includes/functions.php on line 6121
Projects – Skyline Designers Engineering Group

Projects

Our engineers, architects, and designers at Skyline Designers Engineering Group have successfully completed various large and small projects, some of which will be presented below.

Road 65 Underpass Turnaround Project, Shahin Shahr

This underpass turnaround is to be constructed on Road 65 near Shahinshahr, Iran. The structural engineering design tasks for this project were successfully completed by our Principal Structural Designer, Ali Vafi. He was presented with the task of carrying out the structural design of the two bridges that carry the freeway over the underpass (one bridge for each direction of traffic flow), the bridge that carries the railway over the underpass, the required reinforced concrete retaining walls, and the concrete septic tank needed for stormwater drainage.

Expansion Project for Gaz Kermani's Manufacturing Facility

In 2020, Gaz Kermani, a confectionery producing company, planned on expanding their manufacturing facility and consequently, signed an EPC contract with Skyline Designers Engineering Group tasking us with carrying out all design and construction tasks needed for completing the project. In this project, a manufacturing facility covering a total area of approximately 4000 square meters was to be erected on their premises, allowing them to increase their production capacity. In order to complete this project, all of the following tasks were successfully carried out by our team of engineers and architects at Skyline Designers Engineering Group:

– All design tasks including Architectural Design, Structural Design, and Mechanical, Electrical, and Plumbing (MEP) Engineering Design of the manufacturing facility.

– All construction tasks including Project Management, Procurement, and Construction Engineering.

Design of Structural Elements for Line 3 of the Tehran Metro

Our Principal Structural Engineer, Ali Vafi, was a member of the structural design team presented with the task of carrying out the structural design of a segment of Line 3 of the Tehran Metro while working at Boland Payeh Co. The team designed the main structures and retaining structures of the tunnels, structures of the stations, access galleries, and also ventilation and elevator shafts in that segment of the metro system, which is located in the North Eastern part of the capital.